Activity & Resource Reports

Location-based schedules are always resource-based because the intention is to optimize crew flow and improve project durations by targeting production rates. Resources are, in most cases, supplied by the subcontractors and not the entity which is responsible for project scheduling and production control. It has been our experience that black box approaches to production control do not work well. In order to maintain control, the GC needs to anticipate issues and proactively control production rates. And in order to do this, feedback from subcontractors is needed in real time.

In the planning phase after productivity data and quantities have been reviewed with subcontractors, a general commitment should be made to the overall shape of the initial planned resource graph. If the plan is good the overall shape should hold. However, everyone needs to recognize that the details will change. There is no correct productivity value – the productivity of individual workers is highly variable and even the same worker can have different productivity on a Monday and on a Friday. Therefore, it should be expected that adjustments will always happen. This can be done by reviewing the “current” forecast-based resource graphs regularly with the subcontractors.

Current resource graphs are based on actual productivity values for any tasks that have started and planned values for any upcoming new tasks. They also take into account any agreed control actions. By using the current resource graph, the GC can inform the subcontractors well in advance of additional resource requirements. Subcontractors should look ahead at least two weeks and inform the GC of any new planned mobilizations and demobilizations. If the forecast and subcontractors expectations do not align, either the forecast or expectations need to be changed. Typically the forecast would be adjusted first by using control actions and if the adjustment does not result in a detrimental outcome the subcontractor’s expectation can be accommodated.

Activity  Report
Activity  Report
Activity  Report

3DPrime Provides following Unique Structural BIM Services

  • Structural 3D Modeling
    • Main and Secondary Frame modeling
    • Structural Finishes
  • Façade Modeling
  • 3D Precast Modeling
  • Precast Panel Modeling & Detailing
  • 3D Rebar Modeling for,
    • Accurate Rebar BOQ
    • BBS (Bar Bending Schedules)
  • Structural 2D Drafting & Detailing
  • BOQ-Structural Model Elements
  • Structural GFC Layout (GA Drawings )
  • Scan To BIM Services for Structural
  • Structural Steel Connection Modeling
  • Structural Steel Fabrication Drawings
    • Assembly Drawings
    • Single Part Drawings
    • Multi Part Drawings
    • Bolt & Weld Lists
image

3DPrime Provides following Unique Structural BIM Services

  • Structural 3D Modeling
    • Main and Secondary Frame modeling
    • Structural Finishes
  • Façade Modeling
  • 3D Precast Modeling
  • Precast Panel Modeling & Detailing
  • 3D Rebar Modeling for,
    • Accurate Rebar BOQ
    • BBS (Bar Bending Schedules)
  • Structural 2D Drafting & Detailing
  • BOQ-Structural Model Elements
  • Structural GFC Layout (GA Drawings )
  • Scan To BIM Services for Structural
  • Structural Steel Connection Modeling
  • Structural Steel Fabrication Drawings
    • Assembly Drawings
    • Single Part Drawings
    • Multi Part Drawings
    • Bolt & Weld Lists
image

3DPrime Provides following unique MEP-HVAC Services

  • 3D Mechanical Elements Modeling
  • 3D Plumbing Modeling
  • 3D Electrical Modeling
  • Clash Detection & Resolution Services
    • CDR Reports (Project team's review, Approvals and incorporation in model). Model based resolution (For discrepancies).
    • Project Coordination Support. Support for Optimized routing Support and incorporation into 3D Model.
  • Composite Services Drawings (CSD) From Clash Free Model
    • Customer specific scale with ISO Standard Drawing Size
  • Shop Drawings / Fabrication Drawings (Single Services Drawings = SSD)
    • HVAC Ducting & Equipment Layout
    • Piping & Equipment Layout with Section Details
    • Fire Fighting System Layout
    • Lighting & Conduit layout
    • Cable Tray layout with Section Details
    • Spool Drawings
    • Sleeve Drawings
    • Builders Work Drawing
  • Drainage, water supply, Ran water layout with sectional details
image

3DPrime Provides following unique MEP-HVAC Services

  • 3DPrime 4D SERVICES: (Basic & Advance)

  • Complete initial (planned) schedule incorporation in model by linking up of the construction schedule provided by Clients/Main Contractor.
  • Mapping site progress into 3D model for various projections, including schedule for identifying delays and updating client on any such lapses and deviations regularly, mostly on fortnightly basis.
  • Planned Vs Actual 3D representation on project status update for schedule. Thereof incorporating revised schedule and rescheduling from any such situation
  • 3dprime 4D SERVICES: (Advance)

  • 4D Baseline Schedules
  • 4D Schedule Updates
  • 4D Logistics Planning
  • 4D Collaborative Foremen Meetings
  • 4D What-If Scenarios
  • 4D Planned vs. Actual
  • 4D for Marketing and Public Relations
  • 4D Visuals for Claims and Arbitration
image

3dprime Provides following unique MEP-HVAC Service

  • Land Modeling & Detailing
  • Water Network
    • Water Lines,
    • Junctions, Valves,
    • Tanks, Pumps
  • Road Network
    • Roads, Footpath,
    • Medians, Signals
  • Cut and Fill Model from 3D Model
  • BOQ of Entire 3D Model Elements
  • Sewerage Treatment Plant, Sewerage Systems
  • Storm Water Drains
    • Storm lines, manholes
    • Chambers, junctions
  • Cooking gas lines, Power Systems
image

3D Prime BIM Projects

Residential
Commercial
Mix-Use
Hospitals
Hotels
Shopping Mall
Infrastructure