Project Schedule Optimisation & Animation

Due to the difficulty observed in using the traditional scheduling and monitoring methods, the construction industry has acknowledged that its current scheduling and progress reporting practices are in need of substantial improvements in quality and efficiency. Research efforts to incorporate visualization into scheduling and monitoring have been motivated by the failure of traditional methods.

3DPrime’s expertise in BIM & Construction Scheduling experience gives us the ability to create initial 4D Model. We also work by taking clients schedule in the form of MS-Project, primavera and link it to 3D Model. This is unique opportunity for clients, scheduling tram to revisit the 4D model as it gives an opportunity to schedule in detail that considers maximum elements. It also creates an opportunity to further optimize the schedule or find and incorrect assumptions. The animated show finally gives an idea of the project being built over time. This collaborative approach bridge the gap between the planned schedule and how it is actually built in the field, ultimately minimizing risk in managing complex projects.

Building Information Modelling (BIM) allows project managers and different people involved in the project with different backgrounds to get the accurate information about the project and monitoring of activities. The project manager and client can use the visualization aspects at any stage of the project to monitor the activities and cost flow. BIM improves the construction planning and design efficiency by integrating the 3D model and schedule of the project at one platform.

Our Approach Defined.

We take a three-step approach to 4D Scheduling:

  1. Verify: Using 3D models, we verify the construction documents for any inconsistent or missing representations of work.
  2. Link: We then combine the 3D models with the construction schedule to increase our understanding of project logistics.
  3. Refine: Using the baseline schedule and the 4D simulation of the construction site in 3D space we analyse the time and budget constraints as well as identify any opportunities to improve the project.
BENEFITS OF 4D:
  • Bridge the gap between the planned schedule and how it is actually built in the field
  • Minimize the risk in managing complex projects
  • Provide an easily interpreted schedule for all project members
  • Visually identify design and sequencing conflicts before the project leaves the design phase
  • Inform the public on what to expect during the length of the project
OUR 4D SERVICES: (Basic & Advance)
  • 4D Baseline Schedules
  • 4D Schedule Updates
  • 4D Logistics Planning
  • 4D What-If Scenarios
  • 4D Planned vs. Actual
  • 4D for Marketing and Public Relations
  • 4D Visuals for Claims and Arbitration
Benefits of 4D Scheduling with BIM Platform

The benefits of 4D models based on the BIM platform can be measured in two categories: (1) Tangible Benefits, and (2) Intangible Benefits. While the savings in cost and time, risk mitigation, conflict detection, reduction of complaints, improved productivity and enhanced quality are tangible benefits, a significant intangible gain seems to be in using the 4D models to communicate project parameters visually to home building owners

Tangible Benefits: Savings in Cost and Time, Risk Mitigation, Conflict Detection, Reduction of Complaints, Improved Productivity, Enhanced Quality, etc.

Intangible Benefits: Improved Communication among Various Division. Communicate project parameters visually to non-technical stake holders and get their buy-in.

Improve Subcontractor Coordination: Subcontractors have reported increased field productivity, less rework, and fewer change orders and Requests for Information (“RFI”) when using 4D models as coordination tools. The work of related subcontractors is typically coordinated through 2D overlays, which allow a project team to identify some spatial conflicts in the design. However, the construction phase can introduce entirely new spatial conflicts that are very difficult to identify with 2D overlays. This issue is resolved through the use of 3D and 4D models by subcontractors.

Optimize Resource Utilization: The use of a 4D model allows for the optimization of labor and Equipment utilization through the analysis of spatial conflicts among crews and other

3DPrime Provides following Unique Structural BIM Services

  • Structural 3D Modeling
    • Main and Secondary Frame modeling
    • Structural Finishes
  • Façade Modeling
  • 3D Precast Modeling
  • Precast Panel Modeling & Detailing
  • 3D Rebar Modeling for,
    • Accurate Rebar BOQ
    • BBS (Bar Bending Schedules)
  • Structural 2D Drafting & Detailing
  • BOQ-Structural Model Elements
  • Structural GFC Layout (GA Drawings )
  • Scan To BIM Services for Structural
  • Structural Steel Connection Modeling
  • Structural Steel Fabrication Drawings
    • Assembly Drawings
    • Single Part Drawings
    • Multi Part Drawings
    • Bolt & Weld Lists
image

3DPrime Provides following Unique Structural BIM Services

  • Structural 3D Modeling
    • Main and Secondary Frame modeling
    • Structural Finishes
  • Façade Modeling
  • 3D Precast Modeling
  • Precast Panel Modeling & Detailing
  • 3D Rebar Modeling for,
    • Accurate Rebar BOQ
    • BBS (Bar Bending Schedules)
  • Structural 2D Drafting & Detailing
  • BOQ-Structural Model Elements
  • Structural GFC Layout (GA Drawings )
  • Scan To BIM Services for Structural
  • Structural Steel Connection Modeling
  • Structural Steel Fabrication Drawings
    • Assembly Drawings
    • Single Part Drawings
    • Multi Part Drawings
    • Bolt & Weld Lists
image

3DPrime Provides following unique MEP-HVAC Services

  • 3D Mechanical Elements Modeling
  • 3D Plumbing Modeling
  • 3D Electrical Modeling
  • Clash Detection & Resolution Services
    • CDR Reports (Project team's review, Approvals and incorporation in model). Model based resolution (For discrepancies).
    • Project Coordination Support. Support for Optimized routing Support and incorporation into 3D Model.
  • Composite Services Drawings (CSD) From Clash Free Model
    • Customer specific scale with ISO Standard Drawing Size
  • Shop Drawings / Fabrication Drawings (Single Services Drawings = SSD)
    • HVAC Ducting & Equipment Layout
    • Piping & Equipment Layout with Section Details
    • Fire Fighting System Layout
    • Lighting & Conduit layout
    • Cable Tray layout with Section Details
    • Spool Drawings
    • Sleeve Drawings
    • Builders Work Drawing
  • Drainage, water supply, Ran water layout with sectional details
image

3DPrime Provides following unique MEP-HVAC Services

  • 3DPrime 4D SERVICES: (Basic & Advance)

  • Complete initial (planned) schedule incorporation in model by linking up of the construction schedule provided by Clients/Main Contractor.
  • Mapping site progress into 3D model for various projections, including schedule for identifying delays and updating client on any such lapses and deviations regularly, mostly on fortnightly basis.
  • Planned Vs Actual 3D representation on project status update for schedule. Thereof incorporating revised schedule and rescheduling from any such situation
  • 3dprime 4D SERVICES: (Advance)

  • 4D Baseline Schedules
  • 4D Schedule Updates
  • 4D Logistics Planning
  • 4D Collaborative Foremen Meetings
  • 4D What-If Scenarios
  • 4D Planned vs. Actual
  • 4D for Marketing and Public Relations
  • 4D Visuals for Claims and Arbitration
image

3dprime Provides following unique MEP-HVAC Service

  • Land Modeling & Detailing
  • Water Network
    • Water Lines,
    • Junctions, Valves,
    • Tanks, Pumps
  • Road Network
    • Roads, Footpath,
    • Medians, Signals
  • Cut and Fill Model from 3D Model
  • BOQ of Entire 3D Model Elements
  • Sewerage Treatment Plant, Sewerage Systems
  • Storm Water Drains
    • Storm lines, manholes
    • Chambers, junctions
  • Cooking gas lines, Power Systems
image

3D Prime BIM Projects

Residential
Commercial
Mix-Use
Hospitals
Hotels
Shopping Mall
Infrastructure